Bidding Document

Before the bidding document submitted, all sections responsible to the project are given the Statement of Work (SOW) they are involved to determine the cost and time they actually needed to complete those works. This way our bidding document represents the realistic target in all dimensions i.e., cost, time and performance.

   
Engineering Project Team

Engineering Project Team is organized depending on the nature of the project either Software/Hardware or Construction. Project manager is from the most involved department. He is incharged of both project team (Full time) and support team (Portion of projects duration) including subcontractors.

   
Planning and Scheduling
Project manager will control the project scheduling by employing Critical Path Method (CPM) and 'S' Curve diagrams with the support of all departments concerned to see through that the project completed efficiently and timely.
   
After Sales Service
CM-7's responsibility is not only stopped at Installation/Commissioning. We make sure that the system is utilized to it's maximum performance by customer's operator via intensive training both Class room and On The Job Training along with complete Technical Documents and As-Built drawings.
   
  After the system is up and running, we provide the maintenance both Corrective and Preventive Maintenance to ensure that the system is healthy through out its operational life. We set up the Maintenance Section specially for this purpose. The maintenance team comprised of people who knows the system and supported by group of people who design and build the system.
 
 

 

PTT Public Company Limited
  • Design, Supply and Install Terminal Automation System (TAS) Turn-key projects.
    • Prakhanong Oil Depot.
    • Bang Chak Oil Depot.
    • Saraburi Oil Depot.
    • Lumlukka Oil Depot.
    • Phitsanulok Oil Depot.
    • Pak Panang Oil Depot.
    • Surathani Oil Depot.
    • Phuket Oil Depot.
    • Phuket Aviation Depot.
  • Supply the full Conversion Project Bottom Loading Automation System from Top Loading System
    • Prakhanong Oil Depot.
    • Lumlukka Oil Depot.
    • Surathani Oil Depot.
  • Design, Supply and Install the upgrade system for LPG Depot.
    • Bang Chak LPG Depot.
    • Surathani LPG Depot.
  • Design and Install Additional Hydrant Pump Together with Automatic Controlling System and Computer at Oil Refuel, Phuket Air Port.
  • Design and Install Interface Connection System Between SAP and TAS, and upgrade TAS.
    • Prakhanong Oil Depot.
    • Bang Chak Oil Depot.
    • Bang Chak Gas Depot.
    • Saraburi Oil Depot.
    • Lumlukka Oil Depot.
    • Phitsanulok Oil Depot.
    • Pak Panang Oil Depot.
    • Surathani Oil Depot.
    • Surathani Gas Depot.
    • Phuket Oil Depot.
    • Phuket Aviation Depot.

Kuwait Petroleum Aviation (Thailand) Limited
  • Supply of Central Metering Computer & Software at Chonburi Oil Terminal, Chonburi
  • Supply a Turn-key Operation to Restore Gantry Automation System Including; Installation of Equipment, Instruments, Power & Control, Instrument & Optical Cabling and System Commissioning
  • Provide complete system maintenance both hardware/software for Chonburi Oil Terminal Automation
  • Supply and Install MIMIC Control and Monitoring Panel at the Operation Control Room, Chonburi Oil Terminal
  • Supply and Install Pnuematic Foam System for CBT

The Shell Company of Thailand Limited

  • Supply a Turn-key Automation Black Oil Gantry for shell’s Oil Depot, Bangkok (CNS) including, instrumentation, cabling, conduit laying, micro-computer control cabinets and application software.
  • Supply and install Automation Systems for the extension White Oil Gantry of CNS Oil Depot facility.
  • Design and install a fail-safe system for flow control valves using PLC.
  • Design and install a MIMIC Control Panel for Bitumen blending plant at CNS Oil Depot.
  • Supply a turn-key automation for Barge and Rail Wagon Loading systems at CNS Oil Depot.
  • Design and install LPG Loading facility safety control system at CNS Oil Depot.

Project NGV
  • Installation System GAS station NGV Banpong Branch of Ratburi
  • Installation System GAS station NGV Rojana Branch of Ayuthaya
  • Installation System GAS station NGV Bangbouethong Branch of Nonthaburi
  • Installation System GAS station NGV Nuanchan Branch of Bangkok
  • Installation System GAS station NGV Susco Vibhabadi Rangsit Branch of Bangkok
  • Installation System GAS station NGV Bang Kae Branch of Bangkok
  • Installation System GAS station NGV Samaedum Branch of Bangkok
  • Installation System GAS station NGV Phuttamonthon Sai 4 Branch of Nakhon Pathom
  • Installation System GAS station NGV Bangphahan Branch of Ayuthaya
  • Installation System GAS station NGV Samkok Branch of Pathumthani (Mother Station)
  • Installation System GAS station NGV U Thong Branch of Suphanburi

Project Contruction / Civil
  • Construction part of the roof that overhangs a wall for protection from rain in Phakanong Oil Terminal (PTT Public Company Limited)
  • Construction part of the roof that overhangs a wall for protection from rain to take oil in Chaingmai Oil Terminal (PTT Plublic Company Limited)
  • Construction Tank (B100) Oil Amount Quantity 440,000 litres (2 tanks) at Saraburi Oil Terminal
  • Construction / Civil Installation Receive - Provide System Gasohol 91 Udonthani Oil Terminal
  • Construction / Civil Installation Receive Additive Saraburi Oil Terminal

ESSO Oil Company
  • Supply & Installation of Fire Alarm System for Hazardous area, Sriracha Depot.
  • Supply & Installation of Digicom Intercom System, Sriracha Depot.

Polytechnology Company Limited
  • Conduiting, Cabling, Tubing & Installation of Box - Valve
  • E&I Sahcogen Chonburi
  • Conduiting, Cabling, Tubing & Installation of IPT-Natureal Gas Metering and Regulating Station
  • E&I Block Valve #12
  • E&I NGV Block Valve#11
  • E&I NGV Sirchoenphan

Booz Allen Hamilton
  • Supply & Installed Fiber Optics UTP cables (LAN network) for all Royal Thai Arm Forces in Bangkok
  • Cabling for AVS & UTP at Chaeng Wattana, Supreme Commander HQ
  • RTSC C3I Chaeng Wattana, Supreme Commander HQ

Thai Industrial Gasses Public Company Limited
  • Conduiting, Cabling, Tubing for TIGAC CO2 Plant Rayong.
  • Conduiting, Cabling, Tubing for Thai Asahi Glass Manufacturing Plant, Rayong
  • Suppy Material & Manpower for Renovation Electrical and Instrument Work at TIG-TALAN Saraburi
  • Additional Work TPV Oxygen 20 BARG and Analyzer measure
  • E&I Thai Asahi AMATA City

Procter & Gamble Manufacturing (Thailand) Limited
  • “Load Survey” Wel Grow Industrial Estate.
  • Install Power & Control Cable and Modify Panel for Metering at Cream and Lotion.
  • Hassia Machine Re-Wiring and Checking with Maual Phase II
  • Assembly for PLC-6000
  • Hassia Machine Re-Wiring and Checking With Manual Phase III

Thai Shell Exploration & Production Company Limited
  • Design and Installation of a Lozad Shedding PLC for the Lan Krabue power generation plant. Controlled by redundant processors (Allen Bradley PLC 5/20) and Message View MMI.

Unique Gas and Petrochemicals Public Company Limited
  • NH3 Fitting at Bang Pakong Depot.
  • Renovation of Electrical Lighting (Ex-proof) System.
  • Renovation of Chemical Gas Room at Nonthaburi Branch and Room at Chokchai 4 Branch.
  • Supply and Install Signal Cabling of Weighty Machine to Bang Pakong Branch

ES Power
  • Design and Install TAS for Ethanol Plant at Srakaew

 

 

 