Scope of work
Installed a 1,000 kVA transformer, the main distribution board (MDB), and the building's power and lighting for a new factory warehouse.
Challenge
Limited space and lifting access to set a 1,000 kVA transformer in place, and tight space for terminating the high- and low-voltage cables.
Result
Completed and tested to electrical engineering standards, giving the warehouse a stable, safe supply for its machinery. It was CM-7's first job for this client, which has come back to us every year since.



