Scope of work
Fitted automatic door operators to the doors of a polyethylene plant building, ran their power and control wiring in conduit, then set up and commissioned each door.
Challenge
Every door had to be set up and commissioned on site, in an operating plant, within the client's schedule.
Result
Completed on schedule, and the client has since come back to us for similar work.


