Scope of work
Installed the lighting and fire alarm system for the extension of a product bagging and warehouse building at a petrochemical plant, working from aerial lifts at roof height.
Challenge
The warehouse stayed in use for shipping throughout, so the work had to fit around its daily operations within a limited time.
Result
Finished on schedule, so the client could open the extended building as planned.



