Project : Upgrading PLC and safety equipment at the Bangchak petroleum depot.
Project : Upgrading PLC and safety equipment at the Bangchak petroleum depot.
Project : Upgrading the TAS system to support Batch Controller, Card Reader, and Interlock ATG Level Alarm at the Saraburi oil depot.
Project : Contract for upgrading the PTTOR-ERP implementation system
Project : Secondary Shutoff Valve SRB/LLK
Project : Replacing Protection at Saraburi Oil Depot
Project : Installation New System for GSP Truck loading
Year 2021
Project : The project for procurement and installation of PLC, along with upgrading the TAS system, to support the construction of B100 and Ethanol oil tanks at the Saraburi oil depot.
Project : The contract project for renovating the check-in and check-out lanes at the Saraburi oil depot.
Year 2020
Project : UTILITIES SUPPLY TO HMC PP#4 PROJECT
Project : Convert Top Loading to Bottom Loading at SRB Road Loading Island 1
Project : Ligthning Protection Warehouse
Project : The project for upgrading the automatic Jet A-1 and HSD oil distribution system through FPT pipelines at the oil depot
Year 2019
Project : The project for upgrading the automatic control system to support the inline blending oil distribution system at the Phra Khanong oil depot.