Scope of work
Moved every function of a large hard-wired mimic panel into the SCADA of the CM-7 terminal automation system, re-terminated the related control cables into the PLC, and removed the panel from the control room.
Challenge
The panel was obsolete, hard to change and confusing for operators. It was large and heavy, and cutting or grinding was not allowed in the control room, so it had to be taken apart by hand. The work was done in mid-day periods with no loading, so the terminal had no downtime.
Result
Operators now run the terminal from one SCADA instead of buttons on a wall panel. Every alarm and action is logged, which the old panel could not do, and future changes are a software update.